Melden & Hunt, Inc.
Home Contact Site Map
  Client Login
Services
Project Gallery
About Melden & Hunt
Hargil Colonias Project
Mission Wasterwater Treatment Plant
La Sara Colonias Project
San Carlos Colonias Project
Victoria Road Water Treatment Plant No.5
Owassa Road Water Treatment Plant No.4
North Mission Water Treatment Plant
Hidalgo County Irrigation District No. 1
Hidalgo County Irrigation District No. 16
Bell and Cypress Lift Station/Force Main Upgrade-2002
McAllen Wastewater Plant Lift Station (WW6101-1)-2001
 
Rio Grande Flow Measurement Weir Project
Project:
Rio Grande Flow Measurement Weir Project

The Hidalgo County Irrigation District No. 1 (HCID No. 1) diverts water through its river pump station to provide irrigation and raw water to approximately 50,000 acres and three municipal utilities. The District is required to maintain accurate records of the diversion for the State regulatory agency and for its own management records. Melden and Hunt, Inc. was commissioned to provide design and construction services for a device to provide accurate flow measurement. The firm decided to construct a sharp-crested weir that would be located in the main channel. The weir is capable of an instantaneous flow measurement with a range of 50 to 600 cubic feet per second. The instrument totalizer provides an accurate diversion record for a given reporting period. The concrete structure has a crest length of 40 feet. Energy dissipating features were included in the structure.





































    Website Design by MPC Studios